Breach of the main sewer line of the Be’er Sheva leading from the WWTP, in a short period of 24 hours, a steel pipe with a diameter of 42" and a length of 109 m was laid down as a special project, in which an overhead water line crossing Nahal Olim was replaced ..
In order to perform the special work, were required:
A special task that the Oron Group has met with great success.